Ardingly College
Ardingly College had three old gas boilers serving hot water and heating to one area of the school which were beyond their economical life. They wanted a new system which would give them a pay back over a period of years on the energy.
TSS designed and installed a system which reduced the overall Kilowatts of the new boilers. The commercial condensing boilers installed operate high efficiency hot water Calorifiers which achieve 0°C to 55°C in 17 minutes.
Fill in the form below, and we'll call you back to discuss your questions and arrange a survey